RTE I81 over ERIE BOULEVARD EAST WAT

CONNECTION I81NB & I690EB · County 067, New York · Built 1968 · 1 Lanes · 8,888 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000105384A
Year Built
1968
Length
221.6 m (727 ft)
Max Span
38.1 m
Width
10.9 m (35.8 ft)
Lanes
1
Daily Traffic
8,888
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,993,000
Total Project Cost
$9,503,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.