RTE I84 over MC VEIGH ROAD ORANGE HE

1.1 MI EAST EXIT 3 OF I84 · County 071, New York · Built 1967 · 2 Lanes · 17,691 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000001052502
Year Built
1967
Reconstructed
2021
Length
79.7 m (261.5 ft)
Max Span
20.4 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
17,691
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,757,000
Total Project Cost
$5,957,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.