RTE 225 over CHEMUNG RIVER

0.3 MI SW OF INT. WITH NY · County 015, New York · Built 1975 · 2 Lanes · 1,151 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000001049670
Year Built
1975
Reconstructed
2004
Length
184.4 m (605 ft)
Max Span
50.2 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
1,151
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,743,000
Total Project Cost
$12,277,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.