RTE 281 over DRY CREEK

0.1 MI NE JCT RT281+222 · County 023, New York · Built 2017 · 5 Lanes · 17,476 vehicles/day

Overall
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000001044410
Year Built
2017
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
32.6 m (107 ft)
Lanes
5
Daily Traffic
17,476
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,172,000
Total Project Cost
$1,858,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.