RTE 205 over SMALL BROOK

4.1 MI S OF HARTWICK · County 077, New York · Built 2020 · 2 Lanes · 1,660 vehicles/day

Overall
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000001040320
Year Built
2020
Length
12.2 m (40 ft)
Max Span
11.6 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
1,660
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$446,000
Total Project Cost
$707,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.