RTE I87 over ACCESS RD SARANAC RIVER

JCT I87 & SARANAC RIVER · County 019, New York · Built 1998 · 2 Lanes · 9,016 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000001033992
Year Built
1998
Length
122.5 m (401.9 ft)
Max Span
47.2 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
9,016
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,328,000
Total Project Cost
$5,277,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.