RTE I87 over BLACK RIVER

RT I87 2.6 MI N EXIT 31 · County 031, New York · Built 1965 · 2 Lanes · 3,024 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000001033762
Year Built
1965
Length
40.5 m (132.9 ft)
Max Span
36.5 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
3,024
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,672,000
Total Project Cost
$2,651,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.