RTE 86 over W BR AUSABLE RIVER

1.2 MI NE WHITEFACE SKI · County 031, New York · Built 1960 · 2 Lanes · 3,996 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000001032740
Year Built
1960
Length
44.2 m (145 ft)
Max Span
41.7 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
3,996
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,225,000
Total Project Cost
$3,529,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.