RTE 80 over MILL CREEK

AT EDMESTON · County 077, New York · Built 1999 · 2 Lanes · 2,393 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000001030840
Year Built
1999
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
16.9 m (55.4 ft)
Lanes
2
Daily Traffic
2,393
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$719,000
Total Project Cost
$1,140,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.