RTE 458 over ST REGIS RIVER

.25 mi from inter Main St · County 033, New York · Built 1929 · 2 Lanes · 943 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000001029600
Year Built
1929
Reconstructed
1988
Length
16.8 m (55.1 ft)
Max Span
15.8 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
943
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$881,000
Total Project Cost
$1,397,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.