RTE 64 over CENTER GULLY CRK

BRISTOL CTR 0.1M S CR 32 · County 069, New York · Built 2008 · 2 Lanes · 2,344 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

42.808033, -77.390303

This bridge is in worse condition than 18.9% of bridges in County 069. The average bridge in New York is 0 years old; this one is 18 years old.

Nearby Bridges

Bridge Details

Structure #
000000001028890
Year Built
2008
Length
6.7 m (22 ft)
Max Span
6.2 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
2,344
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$575,000
Total Project Cost
$911,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.