RTE 62 over Branch of Big Sister Cre

.2 MI S JCT US 62 & SH 24 · County 029, New York · Built 2022 · 2 Lanes · 3,510 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000001028170
Year Built
2022
Length
9.4 m (30.8 ft)
Max Span
8.8 m
Width
14.7 m (48.2 ft)
Lanes
2
Daily Traffic
3,510
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$752,000
Total Project Cost
$1,193,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.