RTE 35 over WACCABUC RIVER

3 MI S JCT SH 22 & SH 35 · County 119, New York · Built 1937 · 2 Lanes · 14,409 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000001023450
Year Built
1937
Length
9.8 m (32.2 ft)
Max Span
4.3 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
14,409
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,331,000
Total Project Cost
$2,110,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.