RTE 35 over MUSCOOT RESERVOIR

0.6 MI E JCT RTES 35+100 · County 119, New York · Built 1989 · 4 Lanes · 24,276 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000001023410
Year Built
1989
Length
86 m (282.2 ft)
Max Span
32.9 m
Width
20.5 m (67.3 ft)
Lanes
4
Daily Traffic
24,276
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,586,000
Total Project Cost
$13,613,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.