RTE 30 over RAQUETTE RIVER

1.5 MI S OF TUPPER LAKE · County 033, New York · Built 1994 · 2 Lanes · 2,938 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000001021270
Year Built
1994
Length
97.5 m (319.9 ft)
Max Span
52.1 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
2,938
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,947,000
Total Project Cost
$4,672,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.