RTE 20 over BRANCH CAYUGA CREEK

2.7 MI W JCT RTS 20 + 358 · County 029, New York · Built 1931 · 4 Lanes · 11,094 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000001015590
Year Built
1931
Reconstructed
1956
Length
10.4 m (34.1 ft)
Max Span
9.1 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
11,094
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,881,000
Total Project Cost
$2,982,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.