RTE 17C over THORNE HOLLOW CRK

3.0 MI W OF OWEGO · County 107, New York · Built 1995 · 2 Lanes · 2,705 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000001012920
Year Built
1995
Length
8.2 m (26.9 ft)
Max Span
7.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,705
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$446,000
Total Project Cost
$707,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.