RTE 69 over SAUQUOIT CREEK
.4 MI W JCT SH 69 & SH 5A · County 065, New York · Built 1937 · 4 Lanes · 15,562 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.115542, -75.288061
This bridge is in worse condition than 71% of bridges in County 065. The average bridge in New York is 0 years old; this one is 89 years old.
Nearby Bridges
RTE 5A over 69 6926023111 RTE 69
Built 1969
RAMP FM 69 TO 5A over SAUQUOIT CREEK
Built 1970
MAIN STREET over SAUQUOIT CREEK
Built 1986
RTE 922A over CSX TRANS/AMTRAK
Built 1968
RTE 922 over Equalizer
Built 1980
RTE 922A over MOHAWK RIVER
Built 1981
RTE 5A over SAUQUOIT CREEK
Built 1998
RTE I90 over RTE 69
Built 1954
RTE I90 over MAIN ST EXTENSION CSX R
Built 1955
RTE I90 over MOHAWK RIVER
Built 1955
Bridge Details
- Structure #
- 000000001009919
- Year Built
- 1937
- Reconstructed
- 1959
- Length
- 23.8 m (78.1 ft)
- Max Span
- 6.7 m
- Width
- 24.4 m (80.1 ft)
- Lanes
- 4
- Daily Traffic
- 15,562
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,441,000
- Total Project Cost
- $2,285,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.