SENASQUA ROAD over 9 9 87032173 Ramp RT
.7 MI N JCT US 9 & SH 129 · County 119, New York · Built 1962 · 2 Lanes · 896 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
41.209539, -73.896297
This bridge is in worse condition than 29% of bridges in County 119. The average bridge in New York is 0 years old; this one is 64 years old.
Nearby Bridges
RTE 9 over RTE 129
Built 1963
RTE 9 over RTE 129
Built 1963
HALFMOON BAY ROAD over MNRR HU LINE
Built 1987
WARREN RD over 9 9 87032186 RTE 9
Built 1963
RTE 9 over RTE 9A
Built 1964
CROTON POINT AVE over YARD ROAD MNRR HU LINE
Built 1996
QUAKER BRIDGE RD over CROTON RIVER
Built 1930
RTE 9 over FURNACE DOCK ROAD
Built 1964
FURNACE DOCK ROAD over FURNACE BROOK
Built 1948
RTE 9 over FURNACE BROOK
Built 1964
Bridge Details
- Structure #
- 000000001005010
- Year Built
- 1962
- Reconstructed
- 2018
- Length
- 73.2 m (240.2 ft)
- Max Span
- 23.4 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 896
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,209,000
- Total Project Cost
- $6,673,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.