RTE 6 over MNRR HA LINE
0.9 MI W JCT RTS 6+22+202 · County 079, New York · Built 2021 · 3 Lanes · 8,657 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
41.398194, -73.620203
This bridge is in worse condition than 10.4% of bridges in County 079. The average bridge in New York is 0 years old; this one is 5 years old.
Nearby Bridges
COUNTY ROAD 56 over E BR CROTON RIVER
Built 1930
RTE 6 over EAST BRANCH CROTON RIVER
Built 1931
TONETTA LAKE ROAD over MNRR BEACON LINE
Built 1986
PROSPECT HILL RD over MNRR HA LINE TONETTA BR
Built 2018
RTE I84 over COUNTY ROAD 58
Built 1968
RTE I84 over COUNTY ROAD 58
Built 1968
RTE I84 over ARGONNE ROAD RIVERSIDE
Built 1970
RTE I84 over ARGONNE ROAD RIVERSIDE
Built 1970
RTE 22 over MNRR BEACON LINE
Built 1965
RTE I84 over MNRR BE LINE
Built 1968
Bridge Details
- Structure #
- 000000001003510
- Year Built
- 2021
- Length
- 32.6 m (107 ft)
- Max Span
- 31.1 m
- Width
- 18.3 m (60 ft)
- Lanes
- 3
- Daily Traffic
- 8,657
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Railroad
- Last Inspected
- N/A
- Est. Improvement
- $3,339,000
- Total Project Cost
- $5,295,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.