WEST MAIN STREET over FULMER CREEK

04MI E JCT RTS 28+5S · County 043, New York · Built 1964 · 2 Lanes · 5,304 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000001002730
Year Built
1964
Length
25.6 m (84 ft)
Max Span
24.6 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
5,304
Material
Prestressed Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,288,000
Total Project Cost
$2,042,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.