NJ TPK INT.13 TSI over NJ TPK NSO RWY
.6 MI S ELIZABETH RIVER · County 039, New Jersey · Built 1970 · 1 Lanes · 5,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.637583, -74.208722
This bridge is in worse condition than 26.9% of bridges in County 039. The average bridge in New Jersey is 0 years old; this one is 56 years old.
Nearby Bridges
NJ TPK INTER.13 ST over NJ TPK NSO-NSI-SNI RWYS
Built 1970
NJ TURNPIKE (NSO) over BAYWAY PIPES/LINDEN SWR
Built 1950
NJTPK INT13 RAMPTS over NJTPK PROPERTY
Built 1964
NJ TPK (SNI/NSI) over BAYWAY PIPES/LINDEN SWR
Built 1950
NJ TURNPIKE (SNO) over BAYWAYUTIL&LINDENSTMCHNL
Built 1950
NJTPK INT.13 R.SOT over NJ TPK SNO RWY
Built 1970
NJTPK NSO RWY over RAILROAD AVE. &CRR OF NJ
Built 1970
NJ TPK INT.13 SIT over CENTRAL RAILROAD OF NJ
Built 1970
NJ TPK INTER 13 TN over NJ TPK RWYS & RAMP ST
Built 1965
NJTPK NSI-SNI RWYS over RAILROAD AVE & CRR OF NJ
Built 1950
Bridge Details
- Structure #
- M09913A
- Year Built
- 1970
- Length
- 269.7 m (884.8 ft)
- Max Span
- 38.1 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 1
- Daily Traffic
- 5,500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $1,200,000
- Total Project Cost
- $1,380,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.