MAIN STREET over GSP & NJTPK

0.95 MI N OF US ROUTE 9 · County 023, New Jersey · Built 1949 · 2 Lanes · 16,865 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
M09023A
Year Built
1949
Length
141.1 m (462.9 ft)
Max Span
46.6 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
16,865
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$6,260,000
Total Project Cost
$10,400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.