CHURCH LANE over NJTPK NSO NSI SNO SNI

4.2 MI NORTH OF INT 8A · County 023, New Jersey · Built 1990 · 2 Lanes · 15,019 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
M078180
Year Built
1990
Length
100.9 m (331 ft)
Max Span
31.7 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
15,019
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.