US 130-NJ 49 over NJ TURNPIKE TOLLWY

AT START OF NJ TPK · County 033, New Jersey · Built 1950 · 2 Lanes · 14,438 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
M000000
Year Built
1950
Reconstructed
1966
Length
93.6 m (307.1 ft)
Max Span
26.8 m
Width
19.5 m (64 ft)
Lanes
2
Daily Traffic
14,438
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$212,000
Total Project Cost
$318,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.