GSP NB & SB over MORRIS AVE (ROUTE 82)

AT GSP & NJ 82 JUNCTION · County 039, New Jersey · Built 1954 · 9 Lanes · 174,270 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
361417T
Year Built
1954
Reconstructed
2023
Length
39.6 m (129.9 ft)
Max Span
18.6 m
Width
47.2 m (154.9 ft)
Lanes
9
Daily Traffic
174,270
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.