GARDEN ST PARKWAY over RARITAN RIVER SMITH ST.

0.5 MI SOUTH OF ROUTE 440 · County 023, New Jersey · Built 1954 · 8 Lanes · 116,554 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
361272N
Year Built
1954
Reconstructed
2008
Length
1338.4 m (4391.1 ft)
Max Span
76.2 m
Width
39.3 m (128.9 ft)
Lanes
8
Daily Traffic
116,554
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$1,133,000
Total Project Cost
$170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.