RAMPS E1 & E2 over GSP NBO

GSP INTERCHANGE 105 · County 025, New Jersey · Built 1954 · 3 Lanes · 23,371 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
361064O
Year Built
1954
Reconstructed
1959
Length
14 m (45.9 ft)
Max Span
14 m
Width
16.3 m (53.5 ft)
Lanes
3
Daily Traffic
23,371
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$1,345,000
Total Project Cost
$1,800,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.