GSP SB over NJ 34

0.52mi S of NJ 138&GSP Jc · County 025, New Jersey · Built 1972 · 4 Lanes · 59,859 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
360977S
Year Built
1972
Reconstructed
2014
Length
78.3 m (256.9 ft)
Max Span
38.7 m
Width
23.1 m (75.8 ft)
Lanes
4
Daily Traffic
59,859
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.