FIRE ROAD over ATLANTIC CITY EXPRESSWAY
0.75 MI SE OF GSP&ACE JCT · County 001, New Jersey · Built 1964 · 2 Lanes · 15,557 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
39.407694, -74.542725
This bridge is in worse condition than 70% of bridges in County 001. The average bridge in New Jersey is 0 years old; this one is 62 years old.
Nearby Bridges
DOUGHTY ROAD over ATLANTIC CITY EXPRESSWAY
Built 1965
A.C. EXPRESSWAY EB over GARDEN STATE PARKWAY
Built 1964
Ramp 38SBEA over Ramp 37SBX
Built 2015
A.C. EXPRESSWAY WB over GARDEN STATE PARKWAY
Built 1964
GSP over WASHINGTON AVE (CR 608)
Built 2016
GSP NB over DELILAH ROAD (CR 646)
Built 2015
GSP over PENN-READING SEASHORE RR
Built 1954
GSP SB over DELILAH ROAD (CR 646)
Built 2015
GSP over US RT 40&322 (BL HRS PK)
Built 2016
US ROUTE 9 over ATLANTIC CITY EXPRESSWAY
Built 1965
Bridge Details
- Structure #
- 3500650
- Year Built
- 1964
- Reconstructed
- 1983
- Length
- 51.2 m (168 ft)
- Max Span
- 17.4 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 15,557
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $825,000
- Total Project Cost
- $1,238,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.