GREENWICH ST CR620 over HUDSON SEC (ABAN)

1.03 mi North of CR 519 · County 041, New Jersey · Built 1928 · 2 Lanes · 4,804 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
2150160
Year Built
1928
Length
17.1 m (56.1 ft)
Max Span
16.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
4,804
Material
Steel
Design
Girder and Floorbeam System
Owner
Unknown
Last Inspected
N/A
Est. Improvement
$960,000
Total Project Cost
$1,654,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.