NJ 31 over PEQUEST RIVER

264 ft SOUTH OF US 46 JCT · County 041, New Jersey · Built 1922 · 2 Lanes · 6,145 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
2111155
Year Built
1922
Length
35.4 m (116.1 ft)
Max Span
17.7 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
6,145
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,792,000
Total Project Cost
$4,040,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.