BALDWIN GATE DRIVE over LOWER CRANDON DAM

1.1 MI SW OF CR 521 · County 037, New Jersey · Built 1958 · 1 Lanes · 232 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1920S33
Year Built
1958
Reconstructed
2013
Length
7.6 m (24.9 ft)
Max Span
3 m
Width
6.9 m (22.6 ft)
Lanes
1
Daily Traffic
232
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$107,000
Total Project Cost
$229,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.