CR 603 over EAST BR PEQUEST RIVER

1.73 mi south of US 206 · County 037, New Jersey · Built 1939 · 2 Lanes · 3,105 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
1900G06
Year Built
1939
Length
10.4 m (34.1 ft)
Max Span
5.2 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
3,105
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$240,000
Total Project Cost
$773,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.