NJ 23 over POMPTON RIVER

4.1 MI NORTH OF RTE 80 · County 031, New Jersey · Built 1935 · 6 Lanes · 53,150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
1619151
Year Built
1935
Reconstructed
1986
Length
104.5 m (342.8 ft)
Max Span
22.6 m
Width
33.5 m (109.9 ft)
Lanes
6
Daily Traffic
53,150
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$674,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.