US 46 EB&RAMPS D&E over NJ 23 NB & RAMP G

NJ 23 INTERCHANGE · County 031, New Jersey · Built 1967 · 4 Lanes · 63,362 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1606176
Year Built
1967
Reconstructed
2007
Length
46.6 m (152.9 ft)
Max Span
28.3 m
Width
15.8 m (51.8 ft)
Lanes
4
Daily Traffic
63,362
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$441,000
Total Project Cost
$723,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.