NJ 23 over PEQU RIV RR HMBG TPK SB

4.13 MI N of I-287 · County 027, New Jersey · Built 1934 · 4 Lanes · 63,188 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
3
Serious
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
1405156
Year Built
1934
Length
156.4 m (513.1 ft)
Max Span
22.9 m
Width
18.1 m (59.4 ft)
Lanes
4
Daily Traffic
63,188
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,233,000
Total Project Cost
$9,017,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.