NJ 15 SB over ROCKWAY RIVER

2.2 MI. N. OF ROUTE 80 · County 027, New Jersey · Built 1900 · 2 Lanes · 37,033 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
1404158
Year Built
1900
Reconstructed
1947
Length
15.5 m (50.9 ft)
Max Span
5.2 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
37,033
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$900,000
Total Project Cost
$1,439,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.