CR12 (HUBBARD AVE) over SHADOW LAKE

2 ML NE OF INTCHNG 109GSP · County 025, New Jersey · Built 1945 · 2 Lanes · 9,448 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
130MT30
Year Built
1945
Reconstructed
1978
Length
13.1 m (43 ft)
Max Span
4.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
9,448
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$881,000
Total Project Cost
$1,831,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.