SWEETMANS LN(CR1) over MILLSTONE RIVER

1.43 MI W CR 527A · County 025, New Jersey · Built 1975 · 2 Lanes · 2,927 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
130MS55
Year Built
1975
Length
9.8 m (32.2 ft)
Max Span
9.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
2,927
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$273,000
Total Project Cost
$516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.