US 9 over ERNSTON ROAD (CR.673)

1.23 miles S of GSP · County 023, New Jersey · Built 1993 · 8 Lanes · 93,049 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
1207152
Year Built
1993
Length
36.3 m (119.1 ft)
Max Span
35.4 m
Width
37.8 m (124 ft)
Lanes
8
Daily Traffic
93,049
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.