I-78 EB over NJ 173

At Exit 7 of I-78 · County 019, New Jersey · Built 1959 · 4 Lanes · 50,775 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
1014150
Year Built
1959
Reconstructed
1984
Length
28.3 m (92.8 ft)
Max Span
27.1 m
Width
17.8 m (58.4 ft)
Lanes
4
Daily Traffic
50,775
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$128,000
Total Project Cost
$350,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.