NJ 139 over Conrail (aban Eirie-Lac)

0.35 MI E OF TONNELE AVE · County 017, New Jersey · Built 1927 · 4 Lanes · 78,626 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
0904151
Year Built
1927
Reconstructed
2021
Length
73.8 m (242.1 ft)
Max Span
39.6 m
Width
18.6 m (61 ft)
Lanes
4
Daily Traffic
78,626
Material
Steel
Design
Truss - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,092,000
Total Project Cost
$13,757,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.