US 130 over BIG TIMBER CREEK

0.3 MI S OF NJ 47 JCT · County 015, New Jersey · Built 1928 · 4 Lanes · 20,155 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
0818151
Year Built
1928
Reconstructed
1983
Length
87.5 m (287.1 ft)
Max Span
25.6 m
Width
22 m (72.2 ft)
Lanes
4
Daily Traffic
20,155
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,202,000
Total Project Cost
$21,462,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.