US 322B over RACCOON CREEK

0.45 MI EAST OF US 322 · County 015, New Jersey · Built 1940 · 2 Lanes · 16,400 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
0807152
Year Built
1940
Reconstructed
2019
Length
14 m (45.9 ft)
Max Span
12.8 m
Width
16.7 m (54.8 ft)
Lanes
2
Daily Traffic
16,400
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$420,000
Total Project Cost
$827,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.