YOGI BERRA DRIVE over MONTCLAIR-BOONTON LINE
0.8 MI SE US46 & NJ3 JCT · County 031, New Jersey · Built 1970 · 2 Lanes · 7,365 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
40.8641, -74.1998
This bridge is in worse condition than 67.3% of bridges in County 031. The average bridge in New Jersey is 0 years old; this one is 56 years old.
Nearby Bridges
Clove Road (CR620) over US 46
Built 2019
Ramp J over Third River
Built 2019
US 46 over VALLEY ROAD (CR 621)
Built 2023
Route US 46 EB over Ramp K and Connectors
Built 2022
US 46 RAMP D over NJ 3 EASTBOUND
Built 1957
LONG HILL RD CR631 over MONTCLAIR-BOONTON LINE
Built 1984
Ramp I over US 46 Conn. & Ramp K
Built 2021
US 46 WB over Ramp K
Built 2023
RIFLE CAMP R CR633 over US 46
Built 1939
GROVE STREET over NJ RT 3
Built 1948
Bridge Details
- Structure #
- 0760153
- Year Built
- 1970
- Length
- 36 m (118.1 ft)
- Max Span
- 18.3 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 7,365
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- Unknown
- Last Inspected
- N/A
- Est. Improvement
- $4,457,000
- Total Project Cost
- $16,713,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.