YOGI BERRA DRIVE over MONTCLAIR-BOONTON LINE

0.8 MI SE US46 & NJ3 JCT · County 031, New Jersey · Built 1970 · 2 Lanes · 7,365 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
0760153
Year Built
1970
Length
36 m (118.1 ft)
Max Span
18.3 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
7,365
Material
Concrete
Design
Frame (except frame culverts)
Owner
Unknown
Last Inspected
N/A
Est. Improvement
$4,457,000
Total Project Cost
$16,713,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.