HLYWD AVE(CR 625) over US 46

2.1 MI. EAST OF RT. 159 · County 013, New Jersey · Built 1952 · 2 Lanes · 8,855 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
0722152
Year Built
1952
Reconstructed
2022
Length
42.4 m (139.1 ft)
Max Span
20.7 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
8,855
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,654,000
Total Project Cost
$5,331,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.