NJ 21 SB (VIADUCT) over NJ 21 NB

0.8 mi S of RT7&21 JCT · County 013, New Jersey · Built 1964 · 3 Lanes · 38,438 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
0716158
Year Built
1964
Reconstructed
1994
Length
469.1 m (1539 ft)
Max Span
25.9 m
Width
13.7 m (44.9 ft)
Lanes
3
Daily Traffic
38,438
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$52,077,000
Total Project Cost
$75,759,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.