SPRINGDALE AVE over SECOND RIVER

1.39 MI. W. of CR 509 · County 013, New Jersey · Built 1964 · 2 Lanes · 9,773 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
0700031
Year Built
1964
Reconstructed
1999
Length
8.5 m (27.9 ft)
Max Span
7.9 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
9,773
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$105,000
Total Project Cost
$140,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.