BROADWAY (CR 551) over VINELAND SECONDARY

0.36MI NW of I676 Exit 3 · County 007, New Jersey · Built 1904 · 2 Lanes · 2,725 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
0455160
Year Built
1904
Reconstructed
1945
Length
36.9 m (121.1 ft)
Max Span
9.8 m
Width
20.5 m (67.3 ft)
Lanes
2
Daily Traffic
2,725
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
Unknown
Last Inspected
N/A
Est. Improvement
$3,534,000
Total Project Cost
$7,440,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.